Chapter 8 Benefit/Cost Ratios and Other Measures
2013-9-19 · COSTS = 2,000,000(A/P, 10%, 20) + 180,000 = $415,000 B/C = = 1.57 8-3 The town of Podunk is considering building a new downtown parking lot. The land will cost $25,000 and the construction cost of the lot is estimated to be $150,000. Each year costs associated with the lot are estimated to be $17,500.